Hut 8 — Blitz Index 48 (C)
949MW of contracted AI capacity — the contracts are signed, the buildings are being built.
Confidence: High · Category: ai-infra
Score breakdown
| Section | Score | Detail |
|---|---|---|
| A · Speed | 19 / 25 | Q2 2026 revenue +81% YoY (SEC); 949MW contracted; $7.5B project financing raised in one quarter |
| B · Moat | 32 / 60 | 949MW · $26.6B base-term take-or-pay 15-year; 100% investment-grade tenants; Google backstop |
| C · Creative destruction | 8 / 15 | Bitcoin mining → AI power-infrastructure second curve; contract-proven, delivery pending |
| D · BlitzFailing | −11 | D1 −8: $7.64B long-term debt = 26× TTM (contract-collateralized); CEO dual role at ABTC |
Radar axes (0–100): Moat 53 · Speed 76 · Creative 53.
Watch item
Gates: G1 ✓ (second curve, contracted demand) · G2 ✓ estimated (bar ≈ $3.2B, colocation TAM clears it). 17 points below the threshold — first score. Delivery starting Q2 2027 is the whole thesis.
Strengths
- 949MW · $26.6B base-term contracted (8-K)
- BBB- project financing $7.5B secured
- $1.75B+ avg annual NOI at full delivery
- 8,660MW development pipeline
Concerns
- $51.2M quarterly interest vs $10.4M adj. EBITDA
- Pre-delivery = 100% execution risk
- CEO related-party exposure (ABTC)
- Thin cash firewall for the build
More AI Infra companies
Other AI Infra names on the Blitz Index, highest score first: NVIDIA (87/A), Arista Networks (72/B), Astera Labs (61/B).
Next earnings
Nov 4, 2026 · Before open · Confirmed
Coverage
Hut 8 Corp. · Q3 2026 due Nov 4, 2026 (BMO) · Score 48 · Grade C
Embed this score
Copy the HTML below to show this score on your site. The badge links back to this page and updates automatically when the score changes.
BlitzLab scores businesses against a scholar’s standard — not investment advice. No price targets, no buy/sell recommendations. Figures are from SEC filings (XBRL) as labeled in the source scorecard.